english
Serbian
Russian
Information
Urgent Market Messages
Operational data
Transmission Capacity
Entry / Exit
CMP
Unsuccessful requests
No capacity offer
Auction results
Firm capacity shutdowns
Secondary capacity
Sublet capacity
Nomination
Entry / Exit
Allocation
Entry / Exit
Gas flow
Gas quality
Conversion factor
Linepack
Gas quality specifications
Export
Transmission cost calculator
Documents for downloading
Fuel Gas
Natural Gas prices
Access to the tryGAS syste
Home
>
Operational data
> Interruptible capacity shutdowns
Interruptible capacity shutdowns
Display the information for:
January
February
March
April
May
June
July
August
September
October
November
December
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Entry/Exit point:
(All)
Entry Point Kirevo / Zajecar
Exit Kiskundorozsma 1200
Exit Point Serbia
Virtual Compress Station
Planned and actual interruption of interruptible capacity.
...
Show shutdown situation for entry/exit point
Entry
BP, UGS
Booked interruptible capacity [GWh/d]
Maximum planned interruption of booked capacity
Maximum possible usage of booked capacity
Horgoš
0.000 000
0.000 000
0.000 000
Serbia
0.000 000
0.000 000
0.000 000
VCS
0.000 000
0.000 000
0.000 000
Zajecar
0.000 000
0.000 000
0.000 000
Exit
BP, UGS
Booked interruptible capacity [GWh/d]
Maximum planned interruption of booked capacity
Maximum possible usage of booked capacity
Horgoš
0.000 000
0.000 000
0.000 000
Serbia
0.000 000
0.000 000
0.000 000
VCS
0.000 000
0.000 000
0.000 000
Zajecar
0.000 000
0.000 000
0.000 000