Interruptible capacity shutdowns

Display the information for:
Entry/Exit point:
Planned and actual interruption of interruptible capacity.
... Show shutdown situation for entry/exit point
Entry
BP, UGSBooked interruptible capacity [GWh/d]Maximum planned interruption of booked capacityMaximum possible usage of booked capacity
Horgoš 0.000 000 0.000 000 0.000 000
Serbia 0.000 000 0.000 000 0.000 000
VCS 0.000 000 0.000 000 0.000 000
Zajecar 0.000 000 0.000 000 0.000 000
Exit
BP, UGSBooked interruptible capacity [GWh/d]Maximum planned interruption of booked capacityMaximum possible usage of booked capacity
Horgoš 0.000 000 0.000 000 0.000 000
Serbia 0.000 000 0.000 000 0.000 000
VCS 0.000 000 0.000 000 0.000 000
Zajecar 0.000 000 0.000 000 0.000 000